Breakwater
details 62

International  
Breakwater  
Directory   

  62 Georgia - Poti      (Lat: 42.155 Lon: 41.653 - click for map)

   

   Composite breakwater

   Rehabilitation of existing breakwater

Main breakwater data:

 
Length (m) 1800   owner Poti Seaport
Waterdepth (m) 0   contractor Boskalis
Construction time (years) 0   consultant DMC
Start date (year) 2007   Hydraulic Laboratory Deltares-CSIR
Completion date (year) 2008   comments Existing concrete cubes remain in place and are covered with filter layer
Construction costs($106) 0  

Design criteria

 
Hs (m) 5.2  
Tz/Tp (s) 0/0  

slope/crest info

front slope 1:1.5 2 m3 Xbloc
rear slope 1:0 0
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


  Reference documents:

0 - Xbloc - project sheet; 2010 -Pieter Bakker, Bert Pol, and Joris Rood - Rehabilitation of the old Cube Breakwater of Port of Poti - Georgia with Xbloc® Armour Units; Coasts, marine structures and breakwaters: Adapting to change.


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.