Breakwater
details 527

International  
Breakwater  
Directory   

  527 Saudi Arabia - Marafiq IWPP      (Lat: 27.06 Lon: 49.63 - click for map)

   

   Rubble mound

   

Main breakwater data:

 
Length (m) 500   owner
Waterdepth (m) 7   contractor
Construction time (years) 0   consultant
Start date (year) 2008   Hydraulic Laboratory
Completion date (year) 0   comments
Construction costs($106) 0  

Design criteria

 
Hs (m) 2.1  
Tz/Tp (s) 0/11  

slope/crest info

front slope 1:1.33 0.7 m3 Core-Loc
rear slope 1:0 0 ton
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


  Reference documents:

0 - CLI - Project list nr; - - ;


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.