Breakwater
details 39

International  
Breakwater  
Directory   

  39 Chile - Puerto de Arica      (Lat: -18.4731 Lon: -70.3257 - click for map)

   

   Rubble mound

   Rehabilitation

Main breakwater data:

 
Length (m) 1300   owner Terminal Puerto Arica
Waterdepth (m) 12   contractor
Construction time (years) 0   consultant Baird
Start date (year) 2005   Hydraulic Laboratory
Completion date (year) 2005   comments
Construction costs($106) 0  

Design criteria

 
Hs (m) 5  
Tz/Tp (s) 0/18  

slope/crest info

front slope 1:1.5 5 m3 Core-Loc
rear slope 1:0 0
crestheight (m) 6.6  
crest/caisson width (m) 5  
wallheight (m) 3  
no picture available
click on picture for enlargement
no drawing available
 


  Reference documents:

0 - CLI - Project list nr; 2009 -Patricio Monárdez and Charles Fournier - TETRAPOD BREAKWATER EVALUATION AND REPAIRING USING CORELOC; Coastal Structures 2007


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.