Breakwater
details 323

International  
Breakwater  
Directory   

  323 Qatar - Halul      (Lat: 25.673 Lon: 52.417 - click for map)

   East breakwater

   Rubble mound

   

Main breakwater data:

 
Length (m) 350   owner
Waterdepth (m) 10   contractor Consolidated Engineering Construction
Construction time (years) 0   consultant COWI
Start date (year) 2003   Hydraulic Laboratory
Completion date (year) 2005   comments
Construction costs($106) 0  

Design criteria

 
Hs (m) 4.4  
Tz/Tp (s) 0/7  

slope/crest info

front slope 1:1.33 2.4 m3 Core-Loc
rear slope 1:0 0 ton
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


  Reference documents:

0 - COWI - website; 0 -CLI - Project list nr;
0 - CECC - website; - - ;


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.