Breakwater
details 238

International  
Breakwater  
Directory   

  238 UAE - Fujairah      (Lat: 25.527 Lon: 56.37 - click for map)

   Dhadna Marina

   Rubble mound

   Marina rehabilitation

Main breakwater data:

 
Length (m) 500   owner
Waterdepth (m) 0   contractor
Construction time (years) 0   consultant
Start date (year) 2007   Hydraulic Laboratory
Completion date (year) 0   comments
Construction costs($106) 0  

Design criteria

 
Hs (m) 5.5  
Tz/Tp (s) 0/0  

slope/crest info

front slope 1:0 5 m3 Xbloc
rear slope 1:0 0 m3
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


  Reference documents:

0 - xbloc website - ; - - ;


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.