Breakwater
details 212

International  
Breakwater  
Directory   

  212 Cape Verde - Palmeira      (Lat: 16.7541 Lon: -22.9823 - click for map)

   Phase 1

   Rubble mound

   Modernization of commercial port

Main breakwater data:

 
Length (m) 0   owner
Waterdepth (m) 8   contractor
Construction time (years) 0   consultant Haskoning
Start date (year) 2009   Hydraulic Laboratory
Completion date (year) 0   comments ongoing
Construction costs($106) 0  

Design criteria

 
Hs (m) 3.3  
Tz/Tp (s) 0/0  

slope/crest info

front slope 1:2 2 m3 Accropode
rear slope 1:0 0 ton
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


  Reference documents:

0 - CLI - Project list nr; 0 -Van der Lem, C. - Breakwaters Capability Statement, Version 2.1; Royal Haskoning


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.