Breakwater
details 139

International  
Breakwater  
Directory   

  139 Oman - Sohar industrial port      (Lat: 24.5009 Lon: 56.629 - click for map)

   

   

   port extension

Main breakwater data:

 
Length (m) 0   owner
Waterdepth (m) 9   contractor
Construction time (years) 0   consultant
Start date (year) 2006   Hydraulic Laboratory
Completion date (year) 2009   comments
Construction costs($106) 0  

Design criteria

 
Hs (m) 4.5  
Tz/Tp (s) 0/8.6  

slope/crest info

front slope 1:1.5 3 m3 Core-Loc
rear slope 1:0 0
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


  Reference documents:

0 - CLI - Project list nr; 2010 -AliRiza Gunbak - Modelling of Sohar Intake Breakwater; Coasts, marine structures and breakwaters: Adapting to change.


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.