Breakwater details

International  
Breakwater  
Directory   

515 UAE - Das Island      (Lat: 25.14 Lon: 52.881 - click for map)

Rubble mound
Extension of gas facilities

Main breakwater data:  
Length (m) 400   owner
Waterdepth (m) 0   contractor
Construction time (years) 0   consultant
Start date (year) 2010   Hydraulic Laboratory
Completion date (year) 0   comments
Construction costs($106) 0  
Design criteria  
Hs (m) 0  
Tz/Tp (s) 0/0  
slope/crest info
front slope 1:0 1 m3 Core-Loc
rear slope 1:0 0 ton
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
CLI website


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.