International 511 Angola - Dande
(Lat: -8.465 Lon: 13.37 - click for map) Rubble mound
Breakwater details
Breakwater
Directory
Dalia UFL spool base jetty
Reinforcement
Main breakwater data:
Length (m)
300
owner
Waterdepth (m)
9
contractor
Construction time (years)
0
consultant
Start date (year)
2007
Hydraulic Laboratory
Completion date (year)
0
comments
Construction costs($106)
0
Design criteria
Hs (m)
7
Tz/Tp (s)
0/16
slope/crest info
front slope 1:1.5
8
m3
Accropode II
rear slope 1:0
0
ton
crestheight (m)
0
crest/caisson width (m)
0
wallheight (m)
0
click on picture for enlargement
Reference documents:
CLI website
This is a database prepared by HR Wallingford and TU Delft with the assistance of the
international breakwater community and has been made freely available for the benefit
of breakwater designers, contractors owners and developers worldwide. The database is
subject to regular updating as information becomes available, however the development
and maintenance of this database relies primarily on information supplied or published
by third parties and no responsibility can be taken for the accuracy of data supplied.