Breakwater details

International  
Breakwater  
Directory   

346 Australia - Gorgon LNG terminal      (Lat: -20.149 Lon: 117.919 - click for map)

Rubble mound
New Construction

Main breakwater data:  
Length (m) 2500   owner Chevron-Shell JV
Waterdepth (m) 0   contractor BAM-Thiess JV
Construction time (years) 0   consultant
Start date (year) 2010   Hydraulic Laboratory WRL Sydney
Completion date (year) 2011   comments
Construction costs($106) 0  
Design criteria  
Hs (m) 6  
Tz/Tp (s) 0/0  
slope/crest info
front slope 1:1.33 6 m3 Xbloc
rear slope 1:1.5 0 ton Xbloc
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
Xbloc website


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.