Breakwater details

International  
Breakwater  
Directory   

333 UAE - Mirfa power & desalination plant      (Lat: 24.1308 Lon: 53.4516 - click for map)
Sea walls for cooling water intake

Rubble mound

Main breakwater data:  
Length (m) 3500   owner Ministry of Public Works of UAE
Waterdepth (m) 3   contractor Sainrapt Contracting Company
Construction time (years) 1   consultant
Start date (year) 1994   Hydraulic Laboratory
Completion date (year) 1995   comments 2 breakwaters 1500m and 2000m long
Construction costs($106) 0  
Design criteria  
Hs (m) 1.6  
Tz/Tp (s) 0/0  
slope/crest info
front slope 1:1.5 2 ton Rock
rear slope 1:1.5 0 ton Rock
crestheight (m) 5.35  
crest/caisson width (m) 9.3  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
Breakwaters, coastal structures and coastlines, Allsop N.W.H.


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.