Breakwater details

International  
Breakwater  
Directory   

329 UAE - Dubai - Maritime City      (Lat: 25.27 Lon: 55.268 - click for map)
Sigmoid structure

Revetment

Main breakwater data:  
Length (m) 2050   owner Nakheel
Waterdepth (m) 0   contractor Archirodon
Construction time (years) 0   consultant COWI
Start date (year) 2003   Hydraulic Laboratory
Completion date (year) 2006   comments Total project costs are mentioned
Construction costs($106) 50  
Design criteria  
Hs (m) 0  
Tz/Tp (s) 0/0  
slope/crest info
front slope 1:0 0 ton
rear slope 1:0 0 ton
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
Archirodon website


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.