Breakwater details

International  
Breakwater  
Directory   

327 Qatar - Pearl      (Lat: 25.365 Lon: 51.581 - click for map)
Beach breakwaters

Rubble mound

Main breakwater data:  
Length (m) 0   owner United Development Company
Waterdepth (m) 0   contractor
Construction time (years) 0   consultant COWI
Start date (year) 0   Hydraulic Laboratory
Completion date (year) 0   comments
Construction costs($106) 0  
Design criteria  
Hs (m) 0  
Tz/Tp (s) 0/0  
slope/crest info
front slope 1:0 0 ton
rear slope 1:0 0 ton
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
UDC website COWI website
Pearl Qatar website


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.