Breakwater details

International  
Breakwater  
Directory   

235 Ireland - Calladh Mor      (Lat: 53.08 Lon: -9.5711 - click for map)
Ferry harbour

Rubble mound
rehabilitation

Main breakwater data:  
Length (m) 200   owner County Galway
Waterdepth (m) 0   contractor SIAC
Construction time (years) 1   consultant RPS
Start date (year) 2007   Hydraulic Laboratory
Completion date (year) 2008   comments
Construction costs($106) 0  
Design criteria  
Hs (m) 4.5  
Tz/Tp (s) 0/0  
slope/crest info
front slope 1:1.5 4 m3 Xbloc
rear slope 1:1.5 4 m3 Xbloc
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
Xbloc website Breakwaters and closure dams - Verhagen, H.J., Angremond K., Roode F.


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.