206 Qatar - Halul      (Lat: 25.6796 Lon: 52.3968 - click for map)
West breakwater

Rubble mound
Harbour refurbishment

Main breakwater data:  
Length (m) 512   owner Qatar Petroleum
Waterdepth (m) 0   contractor Archirodon
Construction time (years) 0   consultant COWI
Start date (year) 2001   Hydraulic Laboratory DHI
Completion date (year) 2002   comments Work included demolition of existing lee breakwater of 91m
Construction costs($106) 18  
Design criteria  
Hs (m) 4.4  
Tz/Tp (s) 0/7  
slope/crest info
front slope 1:1.33 2 m3 Core-Loc
rear slope 1:1.33 0 ton Core-Loc
crestheight (m) 6.5  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
Archirodon website CLI website
COWI website


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.