Breakwater details

International  
Breakwater  
Directory   

62 Georgia - Poti      (Lat: 42.155 Lon: 41.653 - click for map)

Rubble mound
Rehabilitation of existing breakwater

Main breakwater data:  
Length (m) 1800   owner Poti Seaport
Waterdepth (m) 0   contractor Boskalis
Construction time (years) 0   consultant DMC
Start date (year) 2007   Hydraulic Laboratory Deltares-CSIR
Completion date (year) 2008   comments Existing concrete cubes remain in place and are covered with filter layer
Construction costs($106) 0  
Design criteria  
Hs (m) 5  
Tz/Tp (s) 0/0  
slope/crest info
front slope 1:1.5 3 m3 Xbloc
rear slope 1:1.5 0 Xbl
crestheight (m) 0  
crest/caisson width (m) 0  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available
 


Reference documents:
Xbloc website


This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.