24 Ireland - Tory Island      (Lat: 55.262 Lon: -8.22 - click for map)
Supply harbour

Rubble mound
rehabilitation of main breakwater

Main breakwater data:  
Length (m) 100   owner Department of Communications, Marine & N
Waterdepth (m) 0   contractor Carillion Irishenco Ltd
Construction time (years) 2   consultant Kirk McKlure Morton
Start date (year) 1999   Hydraulic Laboratory Civil Engineering, Queen's University
Completion date (year) 2001   comments
Construction costs($106) 0  
Design criteria  
Hs (m) 5.8  
Tz/Tp (s) 0/18  
slope/crest info
front slope 1:1.5 5 m3 Core-Loc
rear slope 1:0 0
crestheight (m) 8  
crest/caisson width (m) 4.54  
wallheight (m) 0  
no picture available
click on picture for enlargement
no drawing available

Reference documents:
Website CLI USACE website
Breakwaters, coastal structures and coastlines, Allsop N.W.H.

This is a database prepared by HR Wallingford and TU Delft with the assistance of the international breakwater community and has been made freely available for the benefit of breakwater designers, contractors owners and developers worldwide. The database is subject to regular updating as information becomes available, however the development and maintenance of this database relies primarily on information supplied or published by third parties and no responsibility can be taken for the accuracy of data supplied.